Realization: Paint shop ventilation system
 

Our compandy designed paint shop ventilation system at Agrostroj Pelhrimov in the begining 2020. Project contained seven air handling units and total suction volume was designe dat 63 000 m3/h. The air handling units were delivered with the economical EC motors.

The units were placed near the skylights on the designed support construction. Air distribution is automatic controlled according furnace signal. How this realization looked you can see at the attachment photographs.  

If would you like to find out more information about this realization please let us know. 

Realization year:

2020

Focused at:

DO YOU HAVE INTEREST ABOUT THE SIMILAR SUCTION TECHNOLOGY ?

 

PHOTOGRAPHS FROM REALIZATION

Vzduchotechnická jednotka Remak s EC motorem
Vzduchotechnické jednotky Remak s EC motory
Vzduchotechnické jednotky Remak s EC motory
Rozvody vzduchu v lakovně
Rozvody vzduchu v lakovně
Rozvody vzduchu v lakovně

Installation place

Tigemma Engineering s.r.o.

Radek Těšický
jednatel společnosti

  • Kancelář:
    Masarykovo náměstí 122
    753 01 Hranice
  • +420 724 335 592
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Sídlo společnosti

  • Masarykovo náměstí 122
  • Hranice 753 01
  • IČ: 05294185
  • DIČ: CZ05294185
Copyright © 2018 | created in Zlin by Weboo | Online marketing and technology | All rights reserved.